|
Pyralisk Park - Montpelier, Vermont
|
|
The Pyralisk Arts Center, a 19 year old nonprofit cultural organization, is planning to develop a Performance and Arts Park along the Winooski River in Downtown Montpelier. The 1.3 acre site is occupied by an enormous metal building with structural failures and contaminated soils, from its history as a rail yard.
|
|
Canopy: Cacique del Mar Masterplans - Costa Rica
|
|
The Canopy design process is based on first gaining a deep understanding of regional and site natural systems, climate, people, culture, and history. The masterplan concept that was generated for Cacique del Mar was based on that understanding.
|
|
Gesundheit Institute - Hillsboro, West Virginia
|
In 1979, Gesundheit Institute purchased 310 acres in rural West Virginia to develop a health center. They saw this project as a model for health care, and wanted the physical design of their facility to reinforce their ideas about health.
|
|
Fuller Hill Farm Subdivision - Warren, Vermont
|
|
Fuller Hill Farm was designed to create a residential neighborhood. The development rights on 150 of the 200 acres were donated to the Vermont Land Trust, guaranteeing perpetual protection for wildlife habitat, meadows, and forestland.
|
|
Standish Farm - North Troy, Vermont
|
|
The Village of North Troy received state and federal funds to purchase a farm adjacent to the existing village center.
|
|
Camp Common Ground - Starksboro, Vermont
|
|
Camp Common Ground purchased a beautiful property to use for their family camp. Their goals were to protect the property and to use a portion of the land in a sustainable manner.
|
|
Cambridge Technology Park - Cambridge, Massachusetts
|
|
We were asked to determine the feasibility of developing a nine acre parcel in Cambridge, MA, while maximizing the income from existing income-producing properties.
|
|
Hampshire College - Amherst, Massachusetts
|
|
Hampshire college conducted a national search to select a planning team to assist them in developing an innovative sustainable campus plan and planning process. We assembled a team including energy consultants, development experts, landscape architects, and other architects with collegiate experience.
|
|
Champlain Valley Co-Housing - Charlotte, Vermont
|
|
 Champlain Valley Cohousing asked us to work with them and Kraus-Fitch Architects in designing their 24 family cohousing project in Charlotte.
|
|
Institute for Social Ecology - Rochester, Vermont
|
|
The Institute for Social Ecology was looking for a place to develop an educational center for ecological studies.
|
|
|
|
|